Ricky C. Ng - Dallas TX Thurman W. McPherson - Cortez CO
Assignee:
Mobil Oil Corporation - Fairfax VA
International Classification:
E21B 2910 E21B 33138 E21B 4324
US Classification:
166277
Abstract:
A method for zone isolation or replacing a damaged or corroded casing with a solid plastic is described herein. A resin/curing agent mixture sufficient to form a hardened plastic or solid, underwater and/or at low wellbore temperatures that is also able to withstand downhole stresses, is placed into the wellbore so as to bind with the undamaged casing and close off any thief zone. Subsequently, the resin/curing agent mixture forms a hardened solid. The hardened solid is milled out if necessary so as to form a resinous casing the size of the original casing. Later, the hardened resinous casing is perforated to communicate with a targeted zone. Perforation is not required when isolating a zone. The hardened solid is of a strength sufficient to withstand stresses generated during EOR operations such as carbon dioxide or steam-flooding. Said solid is also resistant to workover acids and other chemicals used in EOR operations.
Low Temperature Underwater Epoxy System For Zone Isolation, Remedial Cementing, And Casing Repair
Ricky C. Ng - Dallas TX Thurman W. McPherson - Cortez CO
Assignee:
Mobil Oil Corporation - Fairfax VA
International Classification:
E21B 2910 E21B 33138 E21B 4324
US Classification:
166277
Abstract:
A method for zone isolation or replacing a damaged or corroded casing with a solid plastic is described herein. A resin/curing agent mixture sufficient to form a hardened plastic or solid, underwater and/or at low wellbore temperatures that is also able to withstand downhole stresses, is placed into the wellbore so as to bind with the undamaged casing and close off any thief zone. Subsequently, the resin/curing agent mixture forms a hardened solid. The hardened solid is milled out if necessary so as to form a resinous casing the size of the original casing. Later, the hardened resinous casing is perforated to communicate with a targeted zone. Perforation is not required when isolating a zone. The hardened solid is of a strength sufficient to withstand stresses generated during EOR operations such as carbon dioxide or steam-flooding. Said solid is also resistant to workover acids and other chemicals used in EOR operations.
Youtube
Haunt: Deliverance Episode 01: The Release
Hello all! This is the first episode of our debut series "Haunt: Deliv...
Category:
Entertainment
Uploaded:
16 Feb, 2011
Duration:
14m 46s
Haunt: Halcyon Days Episode 01- "Through the ...
Season 01-Episode 01. Written by: James Herd and Leah Vianna Cast (In ...
Category:
Entertainment
Uploaded:
25 Jun, 2010
Duration:
9m 24s
Jazz 24/7 Presents Camille Thurman Live at F...
December 17, 2019 Camille Thurman is a gifted saxophonist who has bee...
Duration:
1h 21m 18s
Backs Against The Wall: The Howard Thurman St...
Backs Against the Wall: The Howard Thurman Story explores the extraord...
Duration:
8m 10s
U.S. Army Force Command Cases Colors at Fort ...
Footage of a color casing ceremony at Fort McPherson as the Army's lar...
Duration:
1m 31s
Juan McPherson vs Rondale Mason 147
Rondale Mason defeats Juan McPherson for the welter weight national ti...