Ali Nourai - Dublin OH Jan P. Lenko - Pickerington OH
International Classification:
G01R 3102 G01R 3112
US Classification:
324557
Abstract:
Apparatus for separating the amount of resistive leakage current passing through an insulating portion (14) of an aerial boom (12) which is in contact with an electrical line includes a first current collector band (24) and a second current collector band (22). A first current path extends from the first current collector band to ground. A second current path extends from the second current collector band to ground. A first current flows through the first current path due to current that leaks through the insulating portion of the boom as well as capacitance effects. A second current flows through said second current path due to capacitance effects caused by nearby sources of extraneous ambient electrical energy. A converter box (44) converts the first and second currents into representative first and second voltage signals. The first and second voltage signals are transmitted to an electronics and readout box (70) by a pair of shielded cables (50 and 52) or other conventional means such as optical fibers.
Youtube
Haydn: Sonata in F Major (1st movement) playe...
Boris Lenko in Recital, 17 March 2008
Category:
Music
Uploaded:
31 Jan, 2009
Duration:
4m 21s
28031 - JAKEKA 2009 (HAXTER & LENKO)
Tema de rap de haxter y lenko, dos chavalitos de madrid, santa eugenia
Category:
People & Blogs
Uploaded:
03 Jan, 2010
Duration:
2m 14s
28031 - ESKIZOFRENIA 1 GRADO (LENKO & HAXTER)
Tema de rap de haxter y lenko, dos chavalitos de madrid, santa eugenia
Category:
People & Blogs
Uploaded:
03 Jan, 2010
Duration:
2m 36s
romska muzika Gipsy Kereka Jihlava
Sluchaj Lenko
Category:
Music
Uploaded:
08 Jan, 2011
Duration:
4m 14s
Living Sky Idol
Myshel Pajuaar from Swift Current won first place and $5000 at the Liv...
Category:
News & Politics
Uploaded:
01 Feb, 2010
Duration:
1m 36s
dersim gerilla
baver gerilla iar nerhak baba erdoan lenko cneyt kahraman