Orange Urgent Care 75 Crystal Run Rd STE G40, Middletown, NY 10941 8457032273 (phone), 8457032276 (fax)
Education:
Medical School American University of the Caribbean School of Medicine Graduated: 1998
Languages:
English Spanish
Description:
Dr. Orlando graduated from the American University of the Caribbean School of Medicine in 1998. He works in Middletown, NY and specializes in Emergency Medicine. Dr. Orlando is affiliated with Orange Regional Medical Center.
The controlled explosion projectile ejection system utilizes a source of combustible gas through a controllable input valve into a combustion chamber. Inside the combustion chamber is a sparking means. After the chamber is loaded or filled with gas, a spark control signal is applied to the sparking means and the gas ignites. At the output of the chamber is disposed a controllable output valve. In a simple embodiment, the output valve is simply a valve head biased against the output port of the chamber thereby inhibiting any gas flow from the chamber unless the pressure in the chamber exceeds the biasing force against the valve head. After ignition, the gas expands and the resulting pressure is much greater than the biasing force on the output valve head and the valve opens. Downstream of the output valve is a barrel with the projectile loaded therein. The expanding gas passes through the output valve and ejects the projectile from the barrel.
Name / Title
Company / Classification
Phones & Addresses
Edward Orlando President, Director
Orlando-Maiden, Inc
819 Peacock Plz, Key West, FL 33040
Edward Orlando President, Treasurer, Director, Secretary
The Original Conch Sucker Candy Co
15 Barcelona Dr, Key West, FL 33040
Edward Orlando President, Treasurer, Secretary, Vice President
LIQUID ASSETS, INC
1012 Truman Ave, Key West, FL
Resumes
Director Of Operations At Consynch Systems Management, Llc.
Director of Operations at ConSynch Systems Management, LLC
Location:
New York, New York
Industry:
Construction
Work:
ConSynch Systems Management, LLC since Jul 2013
Director of Operations
Merritt Construction Services Feb 2010 - Jul 2013
Principal
HNTB Jun 2008 - Feb 2010
Vice President, NED Director of PM/CM
WTCC, Port Authority of NY & NJ 2007 - 2010
Director, Cost Control & Management
STV 2004 - 2008
Vice President, National Director of Project Controls
Education:
City University of New York City College 1972 - 1976